i-DE launched the ASTRA-CC project with the goal of improving network design for the energy transition, lowering market barriers for renewable and storage facilities and optimising cost sharing between DSOs and users. The project investigates the conditions for the creation of direct current networks, operatively equivalent to alternating current ones, but designed to facilitate simpler plug&play connections.

By researching new DC secondary substations and network architectures, ASTRA-CC aims to demonstrate how complementing AC designs with DC public networks can bring economic advantages for the connection of renewables and storage to the grid especially in the case of small facilities and rural areas.

By adopting the Analytics4Vegetation solution, E-REDES reduced the necessary personnel effort by 80% and generated around €1M/year savings thanks to the early detection of necessary vegetation-cutting actions. At the same time, the solution guarantees greater network safety and biodiversity protection

Related Success Cases

European Distribution System Operators AISBL                              Rue de la Loi, 82
1040 Brussels
+32 (0)2 737 1340
info@edsoforsmartgrids.eu

Registered identification number:
BE0825.054.581

Subscribe to E.DSO news

Keep up to date with our news, publications, events and initiatives!

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Privacy policy - Sitemap - © E.DSO 2024- All rights reserved. Made by Simpl.